Specifications include, but are not limited to: perform a precision sweep for each campus in its entirety. Each curb line, curb edge and curb corner in all paved surface areas, paved roadways, paved parking areas and all paved surfaces in all parking lots, all roadways and all loading docks shall be cleaned of any and all debris. Contractor shall leave nothing behind at the end of the sweeping shift. Sweeping debris to be removed by the contractor shall include but not limited to: trash, dirt, gravel, rocks, pebbles, leaves, pine straw, grass clippings, small twigs, rain run off dirt and any other debris that the sweeping truck can pick up. No debris shall be blown up onto curbs or other areas but must be blown out onto the paved surface so that the sweeping truck can pick up that debris.