Specifications include, but are not limited to: Cleaning, preparing, repairs as needed for all wood surfaces prior to painting. • Removal of loose or poorly adhering coatings on all substrates on the (front, sides and back) of the buildings. • Removal of rotten wood and replacing it with treated wood on the (front, sides, and back) of the buildings. • Priming and painting of wood siding and trim around the windows on the (front, sides and back) of the buildings. • Priming and painting of (front, sides, and back) portions of the buildings. • Painting of any other exposed substrate not included in the above, which is presently coated with field applied paint on the (front, sides and back) of the buildings. • Clean up.