Specifications include, but are not limited to: MOBILIZATION 1.000 LS BONDS AND INSURANCE 1.000 LS TRAFFIC CONTROL 1.000 LS LIQUID ASPHALT BINDER PG64-22 2.925 TON FULL DEPTH ASPH. PAV. PATCHING 10"UNIF 2,095.000 SY MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 3,495.000 SY MILLED-IN RUMBLE STRIP 6.000 MI HOT MIX ASPHALT SURFACE COURSE TYPE E 45.000 TON PREVENTATIVE MAINTENANCE SURFACE TREATMENT 108,330.000 SY PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1,164.000 SF 4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 46,790.000 LF 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 66,430.000 LF 8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 2,420.000 LF 24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 1,314.000 LF WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 68.000 EA WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 44.000 EA 4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 15,160.000 LF 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 115,268.000 LF 6" YELLOW SOLID LINE ON CURB/MEDIAN - FAST DRY PAINT 300.000 LF 4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 22,050.000 LF 4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 1,500.000 LF 8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 1,210.000 LF 24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 565.000 LF WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 28.000 EA WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 16.000 EA 4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 7,580.000 LF 4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 26,000.000 LF PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 398.000 EA PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 198.000 EA PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 604.000 EA REMOVAL OF ALL PAVEMENT MARKINGS 10.310 LM 4" WHITE BROKEN LINES- (GAPS EXCLD) - SINGLE COMPONENT HYBRIDIZED POLYMER– 20 MILS 1,320.000 LF