Specifications include, but are not limited to: MOBILIZATION 1.000 LS BONDS AND INSURANCE 1.000 LS TRAFFIC CONTROL 1.000 LS BORROW EXCAVATION 1,378.000 CY MAINTENANCE STONE 49.000 TON LIQUID ASPHALT BINDER PG64-22 483.257 TON FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 4,900.000 SY MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 40,007.000 SY MILLED-IN RUMBLE STRIP 6.280 MI HOT MIX ASPHALT SURFACE COURSE TYPE D 7,213.867 TON DRIVEWAY PAVING-SURFACE TYPE D 456.875 TON PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1,624.000 SF 4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 8,919.000 LF 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 176,645.000 LF 24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 1,295.000 LF WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 11.000 EA WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 7.000 EA 4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 18,500.000 LF 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 117,220.000 LF 6" YELLOW SOLID LINE ON CURB/MEDIAN - FAST DRY PAINT 1,050.000 LF 4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 3,123.000 LF 4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 113,230.000 LF 24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 665.000 LF WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 5.000 EA WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 3.000 EA 4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 12,950.000 LF 4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 56,785.000 LF PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 100.000 EA PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 70.000 EA PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 888.000 EA