Specifications include, but are not limited to: MOBILIZATION 1.000 LS BONDS AND INSURANCE 1.000 LS TRAFFIC CONTROL 1.000 LS BORROW EXCAVATION 1,412.000 CY MAINTENANCE STONE 19.750 TON LIQUID ASPHALT BINDER PG64-22 431.530 TON FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 1,975.000 SY MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 1,000.000 SY MILLED-IN RUMBLE STRIP 11.120 MI HOT MIX ASPHALT SURFACE COURSE TYPE D 6,520.901 TON DRIVEWAY PAVING-SURFACE TYPE D 328.750 TON PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1,456.000 SF 4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 1,700.000 LF 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 149,150.000 LF 24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 170.000 LF WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 8.000 EA WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 8.000 EA 4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 15,630.000 LF 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 80,230.000 LF 4" WHITE SOLID LINES (PVT. EDGE LINES) EPOXY PAINT 120.000 LF 4" YELLOW BROKEN LINES(GAPS EXC) EPOXY PAINT 20.000 LF 4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 850.000 LF 4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 74,575.000 LF 24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 85.000 LF WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 4.000 EA WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 4.000 EA 4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 7,815.000 LF 4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 40,115.000 LF PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 20.000 EA PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 494.000 EA