Specifications include, but are not limited to: MOBILIZATION 1.000 LS BONDS AND INSURANCE 1.000 LS TRAFFIC CONTROL 1.000 LS REMOVAL & DISPOSAL OF EXISTING PAVEMENT 150.000 SY REMOVAL & DISPOSAL OF EXISTING CONCRETE 3.000 CY BORROW EXCAVATION 15.000 CY EXCAVATION FOR SHOULDER PAVING 14.000 STA HAULING OF EXCAVATED SHOULDER MATERIAL 14.000 STA HMA SHOULDER WIDENING COURSE 137.280 TON LIQUID ASPHALT BINDER PG64-22 8.489 TON FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 500.000 SY FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 900.000 SY FULL DEPTH ASPH. PAV. PATCHING 10"UNIF 2,300.000 SY MILLED-IN RUMBLE STRIP 3.180 MI HOT MIX ASPHALT SURFACE COURSE TYPE E 25.000 TON PREVENTATIVE MAINTENANCE SURFACE TREATMENT 72,428.597 SY PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1,346.000 SF 4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 24,432.000 LF 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 57,065.000 LF 24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 549.000 LF WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 26.000 EA WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 20.000 EA WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT 12.000 EA 4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 1,800.000 LF 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 82,039.000 LF 6" YELLOW SOLID LINE ON CURB/MEDIAN - FAST DRY PAINT 120.000 LF 4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 11,315.000 LF 4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 7,200.000 LF 24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 185.000 LF WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 9.000 EA