Specifications include, but are not limited to: MOBILIZATION 1.000 LS BONDS AND INSURANCE 1.000 LS TRAFFIC CONTROL 1.000 LS BORROW EXCAVATION 300.000 CY MAINTENANCE STONE 7.000 TON LIQUID ASPHALT BINDER PG64-22 213.890 TON FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 700.000 SY MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 700.000 SY MILLED-IN RUMBLE STRIP 6.100 MI HOT MIX ASPHALT SURFACE COURSE TYPE D 3,320.083 TON PREVENTATIVE MAINTENANCE SURFACE TREATMENT 88,200.000 SY DRIVEWAY PAVING-SURFACE TYPE D 75.000 TON PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 908.000 SF 4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 460.000 LF 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 208,300.000 LF 24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 450.000 LF 4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 15,880.000 LF 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 100,820.000 LF 4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 260.000 LF 4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 32,300.000 LF 24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 105.000 LF 4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 4,100.000 LF 4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 27,600.000 LF PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 680.000 EA 4" WHITE BROKEN LINES- (GAPS EXCLD) - SINGLE COMPONENT HYBRIDIZED POLYMER– 20 MILS 240.000 LF 4" WHITE SOLID LINES-(PAVEMENT EDGE LINES)-SINGLE COMPONENT HYBRIDIZED POLYMER–20 MILS 47,800.000 LF 24" WHITE SOLID LINES-(STOP/DIAGONAL LINES)-SINGLE COMPONENT HYBRIDIZED POLYMER–20 MILS 130.000 LF