Specifications include, but are not limited to: Conducting Pile Driving Analyzer (PDA) dynamic testing, Cross-Hole Sonic Logging (CSL) testing, Pile Integrity Testing (PIT), Thermal Integrity Profiler (TIP) testing, and other approved foundation testing methods; Perform CAPWAP (Case Analysis Program) signal matching and 3-D Tomography analysis; Foundation Load Test monitoring; Earth-borne Vibration monitoring; Pre- and Post-Construction Condition survey of structures; Structural Monitoring during construction; Geotechnical Instrumentation monitoring as it relates to bridge and approach work; Provide recommendations and reports of the results of the investigations, monitoring, instrumentation, testing, and analysis.