The closed MSW/C&D cell identified as Phase IIIA approximately 20 acres to the rear of the property is not draining properly (see attached map). The existing berm must be repaired along with some of the surrounding cap. Positive drainage from the site must be achieved. Any soil required must be supplied by the Bidder. The cap must remain at 2 feet in depth and the ditch along the road below this site must be re-regraded to allow for positive drainage from the site. The gravel road next to the ditch must be repaired if damaged. There are two large areas holding water on top of the cell. Soil suitable for the growth of vegetation must be placed in these areas to allow for positive drainage from the site. All soil must be transported to the site by the Bidder to make repairs. Soil must be fertilized, seeded and have straw placed over the seed. Permeant vegetation must be re-established by the Bidder on all disturbed locations. A vegetation seed mixture of Seresa, Millet, and Fescue must be planted on all disturbed areas.