Specifications include, but are not limited to: installing a new 480 volt, 1.5 megawatt diesel generator, a step up transformer, and a 15 kv switchgear (provided by the Owner) including the required concrete pads. Addition-al work includes rerouting the existing 15 kv overhead power line to the new switchgear location, installing a new concrete encased duct bank, connecting the new duct bank to the an existing 15 kv manhole and fiber optics handhole, providing a fiber optic cable to the existing transfer pump station for generator and switchgear moni-toring by the Owner, switchgear circuit breaker interlocking with the future solar system, repowering the existing fence gate and control panel from the transfer pump station, and performing a short circuit and coordination study. Provisions are also required for the installation of a future generator and transformer.