Specifications include, but are not limited to: The scope of the work includes designing and installing a new stainless steel well liner and new pump. Furnish all installation labor, material, equipment, design, and testing to rebuild the existing King Well with a stainless steel liner (gravel packed) and new pump. The total depth of the well is reported to be 769 feet. Work shall consist of, but not limited to the following items. 1. Televise well. 2. Airlift debris out of well. 3. Design stainless steel liner for installation into the existing King Well. 4. Install a new 12” x 5” stainless steel liner with stainless steel screens. 5. Install proper chlorinated gravel pack. 6. Install test pump and run a 12 hour well capacity test. 7. Televise Well. 8. Install line shaft turbine pump to meet conditions of 300 GPM at 500’ TDH with intake depth of 400 feet. 9. Chlorinate well and sample. 8. Furnish shop drawings to City of Georgetown. 9. Keep work area clean and safe for City operators. 10. Furnish record drawings and technical data to the City of Georgetown