Specifications include, but are not limited to: 1. Excavation: Clear area of all debris, bearing Soil, Type: soil and clay. 2. Foundation: Builder’s choice to build on a crawl space or a slab. Footings: Concrete mix 1:3:5: strength PSI 2500 lb min. Piers: Concrete block, block to be capped with solid block. Slab to have brick walls minimum 12” high from finish grade elevation. Access Door: Frame: Treated, 2" thickness, Door: ½" exterior plywood with 3/4" batten, hinges and hasp Foundation Vents: 16" x 8" automatic Foundation Wall: Material: Brick, Contractor to allow $250 per cube of brick. Brick to be approved by Construction Specialist prior to installation. Wall to be a 4” curtain wall tied into the piers around the perimeter of the house per local codes. Waterproofing: The perimeter to be waterproofed with MasterSeal 581 and French drain to be installed. See GCRA General Construction Specifications for slab requirements. Termite Treatment – All foundations shall be pre-treated for termites in accordance with the South Carolina Standards for the control of termites and other wood destroying pests and the Department of Pesticide Regulations. Properly executed and certified treatment certificates (forms HUD-NPCA99A, Subterranean Termite Soil Treatment Builders Guarantee and HUD-NPCA-99-B New Construction Subterranean Termite Soil Treatment Record) shall be issued to UHC prior to any payment being dispersed. Prior to the final walk through properly executed HUD-92544 Warranty of Completion of Construction form and HUD-92541 Builders Certification of Plans, Specifications, & Site will be required. Install a moisture proof vapor barrier and radon pipe in the crawl space per specifications.