Specifications include, but are not limited to: MOBILIZATION 1.000 LS BONDS AND INSURANCE 1.000 LS CONSTRUCTION STAKES, LINES & GRADES 3.000 EA TRAFFIC CONTROL 1.000 LS CPM PROGRESS SCHEDULE 1.000 LS CLEARING & GRUBBING WITHIN RIGHT OF WAY 1.000 LS CLEARING & GRUBBING WITHIN ROADWAY 1.000 LS REMOVAL & DISPOSAL OF EXISTING PAVEMENT 1,660.000 SY REMOVAL & DISPOSAL OF EXISTING ASPHALT PAVEMENT 1,790.000 SY REMOVAL OF EXIST. GUARDRAIL 1,500.000 LF UNCLASSIFIED EXCAVATION 24,532.000 CY BORROW EXCAVATION 3,313.000 CY MUCK EXCAVATION 70.000 CY 15" DIAMETER PIPE ADDITIONAL FOUNDATION WORK 20.000 LF 18" DIAMETER PIPE ADDITIONAL FOUNDATION WORK 96.000 LF 24" DIAMETER PIPE ADDITIONAL FOUNDATION WORK 20.000 LF 30" DIAMETER PIPE ADDITIONAL FOUNDATION WORK 16.000 LF 36" DIAMETER PIPE ADDITIONAL FOUNDATION WORK 20.000 LF GEOTEXTILE, SEPARATION 190.000 SY STRUCTURE EXCAVATION FOR CULVERTS 383.000 CY TEMPORARY SHORING WALL 28.000 LF NO. 57 STONE FOR BACKFILL 130.000 TON FINE GRADING 39,271.000 SY FLOWABLE FILL 40.000 CY GRADED AGGREGATE BASE COURSE (8" UNIFORM) 1,204.000 SY MAINTENANCE STONE 540.000 TON HOT MIX ASPHALT BASE COURSE - TYPE B 327.000 TON HMA SHOULDER WIDENING COURSE 7,150.000 TON PRIME COAT 325.000 GAL LIQUID ASPHALT BINDER PG64-22 679.300 TON MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 2,664.000 SY MILLED-IN RUMBLE STRIP 14.000 MI