Specifications include, but are not limited to: 1. Complete a Preliminary Engineering Report, plans and specifications, and project construction services for the improvement of existing sewer serving the Hwy 9 Industrial Park, and miscellaneous improvements at the WWTP. 2. Pump Station work includes a replacement/expansion of Pump Station B at the industrial park to approximately 1800 gpm, and upgrade to the existing Pump Station C to approximately 1800 gpm 3. Install approximately 3900 lf of 10”, 12” and 15” gravity sewer within the industrial park to serve current and future industrial discharges. 4. Replace approximately 11,400 lf of 12” and 15” gravity sewer with 21” gravity sewer. Replace 5,300 lf of parallel 15” gravity sewer with a single 24” gravity sewer.