Specifications include, but are not limited to: The project includes removal of the existing pier and design of the replacement pier. Services shall include Existing Pier Removal, Design Replacement Pier Options, Cost Estimates, Schedule, Recommendations, Construction Documents, Permitting and Construction Administration. The design of the new Folly Beach Fishing Pier should incorporate events including fishing tournaments and Moonlight Mixers including various dances such as line dancing. The new pier design shall be designed to minimize disruption to existing pier operations. It is the intent of CCPRC for the scope of the project to include engineering services, permitting, cost estimates, and construction administration for the removal of the existing wooden structure and replacement with a new pier. The selected firm shall obtain the necessary information to acquire all local, state and federal permits, and shall assist in obtaining environmental permits. The materials of the new pier are to be determined in the Design Development phase of the project, based on conception plan options provided from the consultant. All new construction shall be ADAcompliant.