Specifications include, but are not limited to: 1.The contractor should verify all dimensions.2.Items to be removed from upper and lower roof at the direction of the City include:oUpper roof – remove conduit to metal structure (Christmas tree) that is no longer inservice. Contractor is required to ensure all electrical wiring is properly disconnectedand ready for removal.oUpper roof – remove old HVAC lines in center of roof; cut off old lines, seal up holes,and waterproof.oUpper roof – at the AT&T equipment remove the four (4) caps around each leg,waterproof, and re-install.oUpper roof – five (5) old metal caps, remove the cap, waterproof, and re-install asnecessary (as directed by City).oUpper and Lower roof – replace all wood used to support conduit, pipes, etc. with acomposite material.oSeveral unused antennae to be removed, those antennae will be identified during themandatory site visit.3.The existing roof should be pressure washed and the surface prepared for new product to be installed.4.Repair any locations where existing membrane/material has been compromised.5.Apply new product, rolled on surface applied, in accordance with manufacturers’specifications.6.New product is be installed over the existing roof.