Specifications include, but are not limited to: MOBILIZATION 1.000 LS MOBILIZATION - SUBCONTRACTOR 1.000 LS BRIDGE CONSTRUCTION ACCESS 1.000 LS BONDS AND INSURANCE 1.000 LS CONSTRUCTION STAKES, LINES & GRADES 1.000 EA TRAFFIC CONTROL 1.000 LS TEMPORARY SHORING 305.000 SF CPM PROGRESS SCHEDULE 1.000 LS CLEARING & GRUBBING WITHIN RIGHT OF WAY 1.000 LS REMOVAL & DISPOSAL ITEM NO. 001 1.000 LS REMOVAL & DISPOSAL ITEM NO. 002 1.000 LS REMOVAL & DISPOSAL ITEM NO. 003 1.000 LS REMOVAL & DISPOSAL OF EXISTING ASPHALT PAVEMENT 2,652.000 SY REMOVAL & DISPOSAL OF EXISTING BRIDGE 1.000 LS UNCLASSIFIED EXCAVATION 1,789.000 CY BORROW EXCAVATION 15,817.000 CY GEOTEXTILE SOIL REINFORCEMENT 630.000 SY TEMPORARY SHORING WALL 130.000 LF FINE GRADING 8,039.000 SY MAINTENANCE STONE 131.000 TON HOT MIX ASPHALT BASE COURSE - TYPE A 495.000 TON HOT MIX ASPHALT BASE COURSE - TYPE B 2,618.000 TON LIQUID ASPHALT BINDER PG64-22 280.000 TON MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 2,317.000 SY HOT MIX ASPHALT INTERMEDIATE COURSE TYPE C 1,512.000 TON HOT MIX ASPHALT SURFACE COURSE TYPE B 245.000 TON HOT MIX ASPHALT SURFACE COURSE TYPE C 1,104.000 TON PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 232.000 SF 4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 4,618.000 LF 4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 4,618.000 LF PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" PERM. YEL. 71.000 EA PORTABLE TERMINAL IMPACT ATTENUATOR-TEST LEVEL 3(60 MPH) 6.000 EA ANCHOR KIT - PORT. ATTENUATOR(TEST LEVEL 3) 60MPH 8.000 EA