Specifications include, but are not limited to: MOBILIZATION 1.000 LS BONDS AND INSURANCE 1.000 LS TRAFFIC CONTROL 1.000 LS BORROW EXCAVATION 625.000 CY MAINTENANCE STONE 41.250 TON LIQUID ASPHALT BINDER PG64-22 46.800 TON FULL DEPTH ASPH. PAV. PATCHING 4" UNIF. 3,150.000 SY FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 975.000 SY HOT MIX ASPHALT SURFACE COURSE TYPE C 150.000 TON HOT MIX ASPHALT SURFACE COURSE TYPE D 600.000 TON ASPHALT SURFACE TREATMENT(SINGLE TREATMENT) 57,402.000 SY ASPHALT SURFACE TREATMENT (DOUBLE TREATMENT) TYPE 2 12,240.000 SY PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 604.000 SF 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 19,010.000 LF 24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 130.000 LF 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 29,570.000 LF 24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 130.000 LF PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 407.000 EA PERMANENT GRASSING FOR NON-PERMITTED RESURFACING PROJECTS 3.410 ACRE