Visual Engineering Inspection Service 1. Engineering inspection and preventive maintenance. 2. Any needed repairs/touchup. 3. Provide emergency repair service. 4. Ensure Tanks comply with all federal and state regulations. 5. Maintain as per the maintenance program. 6. Provide Written Report with Photographs of Inspection within Thirty (30) Days; Washout & Disinfection Inspection Service 1. Washout inspection, Disinfection, and preventive maintenance. 2. Any needed repairs/touchup. 3. Provide emergency repair service. 4. Ensure Tanks complies with all federal and state regulations. 5. Maintain as per the maintenance program. 6. Provide Written Report with Photographs of Inspection within Thirty (30) Days; Exterior Renovation – All Tanks 1. All exterior surfaces including the dome, bowl, shell walls, balcony, riser columns, ladders, venting, pipes and other appurtenances and component parts will be power washed following a chlorine treatment as set forth in the Steel Structures Painting Council Specification Surface Preparation Specification Number 1, SSPC-SP1 “Solvent Cleaning”. Power washing will be a minimum of 4000 PSI (at nozzle tip) to remove contaminants such as dirt, dust, mold, mildew, chalk, and other foreign contaminants...