• Clearing and grubbing approximately 2 acres • Removing a marked tree • Removing and disposal of approximately 1,700 square yards of existing cart path • Installing approximately 1,300 feet of HDPE piping with yard inlets, bends, caps, and other fittings as specified on the plans and on the included bid sheet • Installing 4’x4’ drain inlet with lid • Converting three existing concrete inlets to manhole with sealed lids • Coring into an existing concrete inlet • Installing six Wapro tide valves provided by the city • Borrow, placement, compaction, shaping and fine grading of 1500 cubic yards of yards of fill material to create new flood barrier berms with a vertical elevation of 7’ (NAVD88) • Constructing approximately 2,000 linear feet of one inch thick and eight feet wide cart path with 1,708 SY of compacted subgrade, 569 CY of compacted graded aggregate base course, and 1,708 SY of asphalt • Constructing 590 linear feet of timber retaining wall having a maximum height of three feet above grade • Installing 74,796 square feet of “419 Bermuda” sod in disturbed areas of the golf course • Providing an as-built survey of all installed work, including topographical information verifying that all new barriers are constructed to be at least elevation 7 (NAVD88).