MOBILIZATION 1.000 LS; BONDS AND INSURANCE 1.000 LS; LIMB TRIMMING 1.000 LS; REMOVAL & DISPOSAL OF EXISTING PAVEMENT 946.000 SY; UNCLASSIFIED EXCAVATION 210.000 CY; BORROW EXCAVATION 404.000 CY; EXCAVATION FOR SHOULDER PAVING 106.000 STA; HAULING OF EXCAVATED SHOULDER MATERIAL 106.000 STA; MAINTENANCE STONE 12.000 TON; LIQUID ASPHALT BINDER PG64-22 130.000 TON; FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 1,185.000 SY; MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 578.000 SY; ASPHALT SURFACE COURSE TYPE B 1,368.000 TON; DRIVEWAY PAVING-SURFACE TYPE D 263.000 TON; ASPHALT SURFACE TREAT (SINGLE TREATMENT) 15,405.000 SY; WARM MIX ASPHALT INTERMEDIATE COURSE TYPE B - SPECIAL 1,066.560 TON; TRAFFIC CONTROL 1.000 LS; PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 592.000 SF; 4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 2,400.000 LF; 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 32,000.000 LF...