Specifications include, but are not limited to: The construction of a new, two-story, fully sprinkled, 137,000 square foot middle school (900/1200 student), located on Camp Road. The facility will be constructed predominately of structural concrete masonry and steel with brick veneer, metal joists, and decking. A single roof system will be utilized overall (modified bituminous sheet system). A direct air to air HVAC system is used for the majority of the spaces with a separate make-up air system providing outside air. Finishes will include, but are not limited to: metal stud & drywall, VCT, ceramic and quarry tile, rubberized flooring, carpet, acoustical ceilings, paint, case-work, marker/tack boards, and an elevator. The package also includes site work and utilities, paving, curb & gut-ter, basic mechanical and electrical services, electrical life safety systems, technology items, and cable trays. C.E. Williams Middle School The work includes, but is not limited to, the construction of a new, two-story, fully sprinkled, 135,000 square foot middle school (900/1200 student), located adjacent to the West Ashley High School. The facility will be con-structed predominately of structural concrete masonry and steel with brick veneer, metal joists, and decking. A single roof system will be utilized overall (modified bituminous sheet system). A direct air to air HVAC system is used for the majority of the spaces with a separate make-up air system providing outside air. Finishes will in-clude, but are not limited to: metal stud & drywall, VCT, ceramic and quarry tile, rubberized flooring, carpet, acoustical ceilings, paint, casework, marker/tack boards, and an elevator. The package also includes site work and utilities including ground modification with stone columns, paving, curb & gutter, basic mechanical and elec-trical services, electrical life safety systems, technology items, and cable trays.