The Work generally consists of the replacement of select large water meters (2″ and larger) at locations throughout the City, including, but not limited to: Removal of existing meter assemblies and appurtenances; Furnishing and installing new 2″–4″ meter assemblies with full-size bypass, inlet strainer, test ports, OS&Y isolation valves, and AMI endpoint mounting; Where indicated, installation of above-ground insulated enclosures (“hot boxes”) on concrete pads; Service tap adjustments or new taps as shown; fittings and connections required to tie-in; Commissioning and data capture, GPS coordinate collection, and pre/post photo logs; Traffic control, erosion control, surface restoration, and disposal of removed materials; All incidental items necessary for a complete and functional installation per City of Aiken Specifications.