Specifications include, but are not limited to: 2.1 Project Description The toll on the Cross Island Parkway (US 278) in Beaufort County is set to expire in 2021. SCDOT proposes, at a minimum, to remove the existing toll plaza, including toll canopy, booths, and excess pavement. In addition, the project will include pavement reconstruction of mainline cross Island Parkway and interchange ramps along with the roadway realignment between Marshland Road interchange and the bridge over Broad Creek. SCDOT intends to enter into a contract for services as detailed in the Contract and Contract’s Exhibits. The Proposer shall be responsible for meeting all Project requirements, specifications, and other applicable criteria as set forth in “Attachments A and B”. Attachment B - Supplemental Project Design Criteria is located on the SCDOT Design-Build website at https://www.scdot.org/business/cross-island-parkwayus278.aspx. 2.2 Project Goals It is the intent of SCDOT to achieve the following goals and objectives for this project. • Cost and schedule certainty • Expedited removal of tolling infrastructure • Pavement strengthening • Minimal impacts to traffic • No change orders