The work includes providing a new server room in existing room P209 in B2400 of NNPTC on Weapons Station which is currently used for office space. The existing server room D216 in B2400 will be moved to the new room in P209. New racks, cable management, and UPS will be installed. No raised flooring will be installed. In-Row cooling will be installed to handle the new server room’s process cooling load. Space for the new server and office space for network engineers will be provided. Internal access control needs to be provided between the server room and office space. New distribution breakers will be installed in P103 in B2400. Fiber will be run from D216 to P209. A new HVAC system will be provided for the server room that is separate from the building HVAC.