Specifications include, but are not limited to: • West End Elementary (HVAC replacement, new water distribution system, new fire alarm system, Interior renovation/ design- paint, ceiling grid/ tiles, LED lights, restroom fixtures/ partitions, cabinetry/ countertops, doors/ door hardware, windows, water coolers, blinds, etc.) Spring/ Summer/ Fall 2022 • Crosswell Elementary (Interior renovation/ design- paint, ceiling grid/ tiles, LED lights, restroom fixtures/ partitions, cabinetry/ countertops, doors/ door hardware, windows, water coolers, blinds, etc.) Summer 2022 • Gettys Middle (Stormwater pipe replacement, new paving- drives/ parking lots, new pick- up/ drop-off loop design, new walking/ riding trail, site lighting, landscaping, etc.) Summer 2022 • East End Elementary (HVAC replacement, Interior renovation/ design- paint, LED lights, doors/ door hardware, water coolers, blinds, etc.) Winter/ Spring/ Summer 2023 • Forest Acres Elementary (Interior renovation/ design- paint, ceiling grid/ tiles, LED lights, restroom fixtures/ partitions, cabinetry/ countertops, doors/ door hardware, windows, water coolers, blinds, etc.) Summer 2023