Specifications include, but are not limited to: The Project generally consists of two additions to the existing detention center totaling approximately 22,500 SF. Construction includes cmu and brick veneer masonry construction, interior CMU partitions, PVC roofing, detention equipment, security electronics and finishes typically associated with a detention center. The Project includes steel modular detention cells, dayrooms, recreation yards, multi-purpose rooms, and utility spaces. Sitework includes sidewalk, grading, and fencing / gates. Mechanical work includes ductwork, plumbing, sprinkler system, smoke control system, controls, and roof top units. Electrical work includes panelboards, lighting fixtures, fire alarm, emergency generator, power, technology wiring and infrastructure; and security systems (cameras, intercoms, duress, door controls, and touchscreens).