REMOVAL & DISPOSAL OF EXISTING PAVEMENT 2,055.000 SY UNCLASSIFIED EXCAVATION 28.000 CY BORROW EXCAVATION 1,198.000 CY EXCAVATION FOR SHOULDER PAVING 632.600 STA HAULING OF EXCAVATED SHOULDER MATERIAL 632.600 STA MAINTENANCE STONE 66.200 TON HMA SHOULDER WIDENING COURSE 5,368.440 TON LIQUID ASPHALT BINDER PG64-22 2,456.552 TON FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 6,620.000 SY MILLING EXISTING ASPHALT PAVEMENT 2.0" 367,995.000 SY ASPHALT SURFACE COURSE TYPE B 35,072.413 TON ASPHALT SURFACE COURSE TYPE C 2,182.427 TON DRIVEWAY PAVING-SURFACE TYPE C 1,931.000 TON TRAFFIC CONTROL 1.000 LS PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 4,068.000 SF 4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 51,720.000 LF 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 280,665.000 LF 8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 26,895.000 LF