RAILROAD INSURANCE AND FLAGGING CSX BORROW EXCAVATION EXCAVATION FOR SHOULDER PAVING HAULING OF EXCAVATED SHOULDER MATERIAL MAINTENANCE STONE HMA SHOULDER WIDENING COURSE LIQUID ASPHALT BINDER PG64-22 ARAMID FIBER FULL DEPTH ASPH, PAV. PATCHING 4" UNIF. FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. MILLING EXISTING ASPHALT PAVEMENT 2.0" MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) ASPHALT SURFACE COURSE TYPE B ASPHALT SURFACE COURSE TYPE C ASPHALT SURFACE COURSE TYPE D DRIVEWAY PAVING-SURFACE TYPE D TRAFFIC CONTROL PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT WHITE LANE DROP ARROW (LEFT OR RIGHT)-FAST DRY PAINT RAILROAD CROSSING SYMBOLS - FAST DRY PAINT 4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT