Loading...
Skip to main content

Open Solicitations

(27,269 results)
27,269 results
Kensington East Street Improvements Minnesota 19 day(s) left Published 06/19/2025 Closing 07/09/2025 443555149083
Bid #25L-001 Resurfacing of 11 Roads Georgia 41 day(s) left Published 06/19/2025 Closing 07/31/2025 443555200878
Excavation, installation, maintenance, and repair of ducts, conduit, cable, and utility poles, and other electric distribution and/or communications facilities, and related work and services Massachusetts 19 day(s) left Published 06/19/2025 Closing 07/09/2025 443555281606
APPLICATION OF A-1 & A-2 SEAL COAT, INCL. 48 TON BIT. MATL'S. (COVER & SEAL), 420 TON SEAL COAT AGG., VAR. PAINT PVM'T. MARKING, ETC. (1.32 MI.) Illinois 10 day(s) left Published 06/19/2025 Closing 06/30/2025 443555350614
CONST. HMA RESURFACING, INCL. 359 TON HMA SC, IL-9.5, MIX C, N70, 180 TON HMA BC, IL-9.5, N70, 3,601 S.Y. HMA SURF. REM., VAR. DEPTH, 562 S.Y. HMA SURF. REM., BUTT JT., 2,810 LB. BIT. MATL'S. (TACK CT. Illinois 10 day(s) left Published 06/19/2025 Closing 06/30/2025 443555350613
DEARMOUN RD: E 140TH AVE - HILLSIDE DR PAVEMENT PRESERVATION Alaska 19 day(s) left Published 06/19/2025 Closing 07/09/2025 443555200851
HMA pavement milling and paving, HMA pavement and aggregate base course patching, concrete curb and gutter and sidewalk spot repairs, driveway removal and replacements, pipe culvert removal and replacements Illinois 11 day(s) left Published 06/19/2025 Closing 07/01/2025 443555350609
THE PROJECT INCLUDES 2" HMA SURFACE REMOVAL, HMA SURFACE COURSE 1" AND 2", LEVEL BINDER 1" AND 2". LEVEL BINDER 1" AND 2", CLASS D PATCHES, 6" SPECIAL, SHOULDER STONE, THERMOPLASTIC PAVEMENT MARKING - Illinois 10 day(s) left Published 06/19/2025 Closing 06/30/2025 443555350611
Crack Sealing Illinois 6 day(s) left Published 06/19/2025 Closing 06/26/2025 443555350612
HMA Surface Removal, Leveling Binder (MM), HMA Surface Course together appurtenant construction Illinois 13 day(s) left Published 06/19/2025 Closing 07/03/2025 443555350610
RFQ GC/CM Roosevelt Elementary Rebuild Project Washington 34 day(s) left Published 06/19/2025 Closing 07/23/2025 443555200884
NALOXONE HYDROCHLORIDE NASAL SPRAY 4mg 2-Pack Texas 19 day(s) left Published 06/19/2025 Closing 07/08/2025 443555315165
Preadmission Screening and Resident Review (PASRR) Services Washington 47 day(s) left Published 06/19/2025 Closing 08/06/2025 443555200885
Castle Pines Metro District - Distribution System Condition Assessment Colorado 26 day(s) left Published 06/19/2025 Closing 07/16/2025 7166060902
HILLCREST SHOPPING CENTER WATER MAIN REPLACEMENT Illinois 18 day(s) left Published 06/19/2025 Closing 07/08/2025 443555350606
Hot Mix Asphalt Resurfacing, Curb and Sidewalk Removal and Replacement Illinois 12 day(s) left Published 06/19/2025 Closing 07/02/2025 443555350608
CONSISTS OF VAR. WIDTH PAVEMENT RESURFACING INCLUDING HMA SURF CSE,MIX "D",N50 (2,136 TON); POLY HMA BINDER CSE,IL-4.75,N50 (917 TON); HOT-MIX ASPHALT SURFACE REMOVAL (21,200 SQ YD); COMB CONC CURB & GUTTER Illinois 11 day(s) left Published 06/19/2025 Closing 07/01/2025 443555350607
2025 PAVEMENT PATCHING PROJECT. Illinois 11 day(s) left Published 06/19/2025 Closing 07/01/2025 443555350604
Powell's Lane Slip Notice to Bidders 2025 Ohio 18 day(s) left Published 06/19/2025 Closing 07/08/2025 443555200883
Buck Drive Circulation Project Nevada 18 day(s) left Published 06/19/2025 Closing 07/08/2025 443555263211
CH 90 Street Repairs Massachusetts 18 day(s) left Published 06/19/2025 Closing 07/08/2025 443555366954
FY26 Tree Services Contract Massachusetts 18 day(s) left Published 06/19/2025 Closing 07/08/2025 443555366952
Deer Isle Sedgwick Bridge Feasibility Study Maine 35 day(s) left Published 06/19/2025 Closing 07/25/2025 443555366967
Cooking Equipment Repair Services New York 7 day(s) left Published 06/19/2025 Closing 06/27/2025 443555366968
Adolfson & Peterson Construction Virginia HQ Campus Project 2 SITE DEVELOPMENT AND DEMOLITION on behalf of MnDOT Minnesota 20 day(s) left Published 06/19/2025 Closing 07/10/2025 443555350602

Your search returned no results.

suggestions:

  • Make sure that all words are spelled correctly.
  • Try different words that mean the same thing.
  • Try more generic terms.

of 400