Loading...
Skip to main content

Open Solicitations

(30,207 results)
30,207 results
Construction of a Roundabout at Small Street and Veterans Drive in Harrisburg. Includes PCC pavement, sidewalks, drainage, signing and lighting. Illinois 28 day(s) left Published 05/14/2025 Closing 06/13/2025 443511559181
Portable toilet BPA FY25 North Dakota 12 day(s) left Published 05/14/2025 Closing 05/28/2025 2599147002
(900-Ft) Bridge joint repair and replacement, and bridge approach pavement improvement Illinois 28 day(s) left Published 05/14/2025 Closing 06/13/2025 443511559180
Remove and construct superstructures on SN 074-0069 (EB) and SN 074-0070 (WB) carrying FAI 72 over the Norfolk Southern Railway to rehabilitate the structures and replace approach pavements. Illinois 28 day(s) left Published 05/14/2025 Closing 06/13/2025 443511559179
SOLE SOURCE – CAREPRO-A50 FLIR CARE PRO GENERAL MAINTENANCE AND CALIBRATION WARRANTY Indiana 6 day(s) left Published 05/14/2025 Closing 05/21/2025 2599084002
2.184 mi Designed Overlay, patching, milling, retaining wall repair, and ADA Improvements from Snow Ave in Loves Park to Whitman St in Rockford and Forest Hills Rd from Landstrom Rd to IL 251. Illinois 28 day(s) left Published 05/14/2025 Closing 06/13/2025 443511442948
Wooden Sign Posts 2025 Maine 5 day(s) left Published 05/14/2025 Closing 05/20/2025 443514500115
Sewage Pump Replacement Minnesota 6 day(s) left Published 05/14/2025 Closing 05/21/2025 443514217098
Safety Hinge Lock Minnesota 6 day(s) left Published 05/14/2025 Closing 05/21/2025 443514270238
Air National Guard Readiness Center Video Teleconference Support Maryland 3 day(s) left Published 05/14/2025 Closing 05/19/2025 2599427502
RFP 37-25-045 - Beck Road & Geddes Road - Bridge Rehabilitation Michigan 27 day(s) left Published 05/14/2025 Closing 06/12/2025 6940904207
Reconstruct North Aircraft T-Hangar Access Pavements Illinois 28 day(s) left Published 05/14/2025 Closing 06/13/2025 443511559177
Bridge deck repairs, joint replacement and miscellaneous repairs on SN 101-0046, carrying US 20 WB over US 20 BR EB, 3 miles west of Rockford. Illinois 28 day(s) left Published 05/14/2025 Closing 06/13/2025 443511559176
Resurfacing and the construction of a multi-use path on Sleepy Hollow Road from Huntley Road to IL-72 in West Dendee. Illinois 28 day(s) left Published 05/14/2025 Closing 06/13/2025 443511559175
(10,700-Ft) Designed Overlay and Shoulder Reconstruction, project includes asphalt removal, earth excavation, pavement patching, resurfacing with (HMA), full depth (HMA) shoulder, pavement markings, raised Illinois 28 day(s) left Published 05/14/2025 Closing 06/13/2025 443511559174
10.5 miles of milling, patching and resurfacing on IL 14 from IL 37 in Benton to west of Happy Row Road in Macedonia. Illinois 28 day(s) left Published 05/14/2025 Closing 06/13/2025 443511559173
Automatic Passenger Counters for City Trolleys Florida 4 day(s) left Published 05/14/2025 Closing 05/19/2025 443514513505
4.06 miles of designed overlay, milling, and patching from Brush Creek to Cedar Creek at NCL of Cedarville on IL 26. Illinois 28 day(s) left Published 05/14/2025 Closing 06/13/2025 443511559171
Solicitation: UltiMaker S8 Pro Bundles Florida 8 day(s) left Published 05/14/2025 Closing 05/23/2025 2599234002
5.39 miles of milling and resurfacing on I-74: I-280/US 6 Interchange to Henry County Line and I-280: Milan Beltway to the I-74/US 6 Interchange. Illinois 28 day(s) left Published 05/14/2025 Closing 06/13/2025 443511559170
2025 Black Creek Well 13 Emergency Generator Modifications Project North Carolina 17 day(s) left Published 05/14/2025 Closing 06/02/2025 443514500108
(4,602-Ft) Smart Overlay improvements include curb and gutter spot repairs (remove and replace), hot-mix asphalt (HMA) surface removal and replacement with (cold milling and inlay), full-depth patches Illinois 28 day(s) left Published 05/14/2025 Closing 06/13/2025 443511559169
Removal and replacement of traffic signal mast arm on US 24 (Main St) at Wesley Rd in Creve Coeur. Illinois 28 day(s) left Published 05/14/2025 Closing 06/13/2025 443511442947
0.725 miles advanced tree removal along US 20 from Mill Rd to 0.3 miles east of Kishwaukee River. Illinois 28 day(s) left Published 05/14/2025 Closing 06/13/2025 443511559168
Testing & Inspections Services during construction phase Colorado 26 day(s) left Published 05/14/2025 Closing 06/10/2025 443511559167

Your search returned no results.

suggestions:

  • Make sure that all words are spelled correctly.
  • Try different words that mean the same thing.
  • Try more generic terms.

of 400