Loading...
Skip to main content

Open Solicitations

(18,786 results)
18,786 results
Breaker Circuit 25 A reset LFLR Missouri 11 hour(s) left Published 08/20/2025 Closing 08/22/2025 443630431911
Bumper Frt R/H End Module Gillig 35-7500, Vent, Dual Square Louver Lflr Buses, HOSE ASM, ABS Valve to Brake Hose Not Stated 11 hour(s) left Published 08/20/2025 Closing 08/22/2025 443630431912
Relay Bosch 24v 10/20a W/Bracket REQ 207514 RFQ 637467 Missouri 2 hour(s) left Published 08/20/2025 Closing 08/22/2025 443630431913
ELECTRICAL GEAR FOR WATAUGA ROAD PUMP STATION Texas 13 day(s) left Published 08/20/2025 Closing 09/04/2025 443625839805
Carnival Grounds Improvements Project, Phase 1 Pennsylvania 12 day(s) left Published 08/20/2025 Closing 09/03/2025 443626185692
Scour mitigation by placing stone dumped riprap at both ends of the culvert and other related construction items at SN 050-2006 carrying IL 18 over Eagle Creek approximately 1.7 miles west of IL Route Illinois 28 day(s) left Published 08/20/2025 Closing 09/19/2025 443626161189
(1,354-Ft) Intersection and ADA Improvements include pavement widening, HMA resurfacing, patching, traffic signal modernization, drainage improvements, pavement markings and landscaping. Located at Joliet Illinois 28 day(s) left Published 08/20/2025 Closing 09/19/2025 443626161187
Removal and replacement of the existing single span bridge (SN 077-0023) carrying IL 169 over Kitchel Slough, west of Karnak. Illinois 28 day(s) left Published 08/20/2025 Closing 09/19/2025 443626136189
0.6 miles of pavement, shoulder and median replacement on IL 1 at the I-64 interchange. Illinois 28 day(s) left Published 08/20/2025 Closing 09/19/2025 443626161186
(304-Ft) Bridge Deck Overlay, Bridge Joint Replacement / Repair Illinois 28 day(s) left Published 08/20/2025 Closing 09/19/2025 443626136188
Sidewalk construction and sidewalk replacement along Shadwell Street to Floyd Henson Jr. High School in Flora. Illinois 28 day(s) left Published 08/20/2025 Closing 09/19/2025 443626161185
Reconstruction of Summit Avenue with a shared-use path from Notting Hill Court to Dooner Drive in Collinsville. Illinois 28 day(s) left Published 08/20/2025 Closing 09/19/2025 443626161184
1.3 miles of resurfacing and ADA improvements on Old US 50, 0.6 miles east of Pipeline Road to 13th Street in Carlyle. Illinois 28 day(s) left Published 08/20/2025 Closing 09/19/2025 443626161183
Remove and replace traffic signals and pedestrian accommodations along Desplaines River Road and Balmoral Avenue in Rosemont Illinois 28 day(s) left Published 08/20/2025 Closing 09/19/2025 443625999622
Bridge deck overlay and bridge deck painting on various structures on I-72: (SN 075-0090 and 0091) over McCraney Creek 1.8 miles east of the IL 96/Hull Interchange, (SN 075-0124 and 0125) over tributary Illinois 28 day(s) left Published 08/20/2025 Closing 09/19/2025 443626161180
Bridge deck overlay on SN 086-0029 carrying CH 14 (800E Hoots Road) over I-72, 0.9 miles east of Plum Creek. Illinois 28 day(s) left Published 08/20/2025 Closing 09/19/2025 443626161182
1.2 miles of pavement patching on I-64 ramps at Exit 89. Illinois 28 day(s) left Published 08/20/2025 Closing 09/19/2025 443626161181
Tree removal and tree installation along US 50 from 320E to 750E. Illinois 28 day(s) left Published 08/20/2025 Closing 09/19/2025 443626161179
Shoulder widening, culvert replacement and culvert extensions on US 45 / IL 141 from south of TR400N to 0.1 miles south of IL 141. Project also includes pavement removal and replacement at the intersection Illinois 28 day(s) left Published 08/20/2025 Closing 09/19/2025 443626136187
0.88 miles of drainage improvements at the intersection of and along US 136 and IL 54, 2.0 miles SW of Bellflower. Illinois 28 day(s) left Published 08/20/2025 Closing 09/19/2025 443626161178
Extension of Old Renwick Road Trail includes aggregate base, HMA surface, culverts, and signage. Project begins west of Petit Court along the DuPage River and ends at the intersection of Renwick Road and Illinois 28 day(s) left Published 08/20/2025 Closing 09/19/2025 443626136186
Bridge deck overlay, bridge joint repair/replacement, bridge deck repairs and striping on I-70 at Crooked Creek, 1.8 miles west of US 40. Illinois 28 day(s) left Published 08/20/2025 Closing 09/19/2025 443626161177
Resurfacing on Madison Avenue from 14th Street to 3rd Street in Madison. Illinois 28 day(s) left Published 08/20/2025 Closing 09/19/2025 443626161176
Call-out bridge deck patching at various locations throughout District 8 on access-controlled roadways. Illinois 28 day(s) left Published 08/20/2025 Closing 09/19/2025 443626161175
(4,646-Ft) The resurfacing project consists of resurfacing the existing HMA pavement with HMA surface course, HMA binder course, thermoplastic pavement markings located FAU 2916 (State Street) from Sauk Illinois 28 day(s) left Published 08/20/2025 Closing 09/19/2025 443626161174

Your search returned no results.

suggestions:

  • Make sure that all words are spelled correctly.
  • Try different words that mean the same thing.
  • Try more generic terms.

of 400