Loading...
Skip to main content

Open Solicitations

(27,679 results)
27,679 results
Gas Compressor Building Mandoor Canopies Alaska 40 day(s) left Published 06/20/2025 Closing 07/30/2025 443556188143
SALE OF 14 & 22 BRIDGE STREET BY THE TOWN OF MONTVILLE Connecticut 40 day(s) left Published 06/20/2025 Closing 07/30/2025 443554927433
CONSTRUCTION OF SPRING LAKE TRAIL FROM NORTHLAKE BOULEVARD TO OAKLAND ROAD (FDOT LAP) Florida 39 day(s) left Published 06/20/2025 Closing 07/30/2025 443556181514
Professional Design, Engineering & Consulting Services Illinois 39 day(s) left Published 06/20/2025 Closing 07/29/2025 443555050505
WATER SYSTEM IMPROVEMENTS Mississippi 39 day(s) left Published 06/20/2025 Closing 07/30/2025 443556168959
Architectural Services New Jersey 39 day(s) left Published 06/20/2025 Closing 07/30/2025 443555098550
ON-CALL SERVICES FOR WATER WELL & PUMP STATION REPAIRS, MAINTENANCE, AND REHABILITATION California 39 day(s) left Published 06/20/2025 Closing 07/29/2025 443556249303
Hazardous Chemical Storage Space California 39 day(s) left Published 06/20/2025 Closing 07/29/2025 443555281646
82624B0022-BEDC - CAT-399E Hudson Drainage Rehabilitation, Electrical New York 39 day(s) left Published 06/20/2025 Closing 07/30/2025 443554929817
J. Iverson Riddle Developmental Center – Cedar Cottage Renovation North Carolina 39 day(s) left Published 06/20/2025 Closing 07/29/2025 443554927445
Large Cap Blend, Small Cap Equity, Large Cap Growth, Large Cap Value, High Yield, Core Plus Fixed Income & Unconstrained Fixed Income Massachusetts 38 day(s) left Published 06/20/2025 Closing 07/28/2025 443554941709
Wyoming PFAS Strategy, Education and Outreach Wyoming 39 day(s) left Published 06/20/2025 Closing 07/29/2025 443556168981
McDowell County Long Term Transitional Housing Sitework Phase 2 North Carolina 39 day(s) left Published 06/20/2025 Closing 07/29/2025 443556150704
RFP-1150 TSM&O ITS IT CONTRACT Florida 38 day(s) left Published 06/20/2025 Closing 07/29/2025 443556181518
Mill 2" of existing HMA asphalt pavement for 2.3 miles and replace with 2" of HMA surface including area reflective crack control and paint striping. Illinois 38 day(s) left Published 06/20/2025 Closing 07/29/2025 443555350643
City of Beaufort - Charles/Craven St Drainage Improvement Projects South Carolina 39 day(s) left Published 06/20/2025 Closing 07/29/2025 443555074670
Engineering for Sludge dewatering project Georgia 38 day(s) left Published 06/20/2025 Closing 07/28/2025 443555209844
After-Hours Janitorial Services for the Delano DMV Field Office California 38 day(s) left Published 06/20/2025 Closing 07/28/2025 443556075731
Spring Creek Dam Rehabilitation Project Phase 1: Alternatives Analysis Colorado 38 day(s) left Published 06/20/2025 Closing 07/28/2025 443556123206
2,300-Gallon Tender Apparatus Michigan 38 day(s) left Published 06/20/2025 Closing 07/28/2025 443556150713
FY2026 Airfield Remediation Texas 35 day(s) left Published 06/20/2025 Closing 07/25/2025 443555356546
KC Water CIS Replacement/Upgrade Missouri 35 day(s) left Published 06/20/2025 Closing 07/25/2025 443555350649
Index B Aircraft Rescue and Firefighting Vehicle (ARFF) Texas 35 day(s) left Published 06/20/2025 Closing 07/25/2025 443556032655
Advertising Material Supply & Installation Services Illinois 35 day(s) left Published 06/20/2025 Closing 07/25/2025 443555281634
Downtown Project Public Finance Consultant Kentucky 35 day(s) left Published 06/20/2025 Closing 07/25/2025 443556181545

Your search returned no results.

suggestions:

  • Make sure that all words are spelled correctly.
  • Try different words that mean the same thing.
  • Try more generic terms.

of 400