Loading...
Skip to main content

Open Solicitations

(28,956 results)
28,956 results
CULVERT REPLACEMENT C/R/S: LAW-SR 243-04.38 Ohio 31 day(s) left Published 10/29/2025 Closing 12/18/2025 443727261141
FOUR LANE RESURFACING C/R/S: MAD-IR 70-00.00 Ohio 31 day(s) left Published 10/29/2025 Closing 12/18/2025 443727261142
TWO LANE RESURFACING C/R/S: MAR-SR 95-00.45 Ohio 31 day(s) left Published 10/29/2025 Closing 12/18/2025 443727261143
BIKEWAYS C/R/S: MIA-SR 571-IMP 06.38 Ohio 31 day(s) left Published 10/29/2025 Closing 12/18/2025 443727261144
BRIDGE REPLACEMENT (1 BRIDGE) C/R/S: MOE-TR 1004-02.27 Ohio 31 day(s) left Published 10/29/2025 Closing 12/18/2025 443727261145
SIDEWALK C/R/S: NOB CEVSD Campus Connectivity Ohio 31 day(s) left Published 10/29/2025 Closing 12/18/2025 443727261146
SPOT PATCHING / PAVEMENT REPAIR C/R/S: PAU-US 24-00.00 Ohio 31 day(s) left Published 10/29/2025 Closing 12/18/2025 443727261147
CHIP SEAL C/R/S: ROS-SR 138-00.26 Ohio 31 day(s) left Published 10/29/2025 Closing 12/18/2025 443727261148
TWO LANE RESURFACING C/R/S: ROS-US 50-04.00/25.27 Ohio 31 day(s) left Published 10/29/2025 Closing 12/18/2025 443727261149
INTERSECTION C/R/S: TRU-US 422-08.01 Ohio 31 day(s) left Published 10/29/2025 Closing 12/18/2025 443727261150
FOUR LANE RESURFACING C/R/S: TRU-US 62-04.56 Ohio 31 day(s) left Published 10/29/2025 Closing 12/18/2025 443727333801
TWO LANE RESURFACING C/R/S: WAY-SR 226-00.905 Ohio 31 day(s) left Published 10/29/2025 Closing 12/18/2025 443727333803
FOUR LANE RESURFACING C/R/S: WOO-IR 75/IR 475-24.85/00.00 Resurf (PART 1 AND PART 2) Ohio 31 day(s) left Published 10/29/2025 Closing 12/18/2025 443727333804
GUARDRAIL REBUILDING C/R/S: D03 GR FY2026 Ohio 31 day(s) left Published 10/29/2025 Closing 12/18/2025 443727333805
RAILROAD GRADE SEPARATION C/R/S: D03 RPM FY2026 Ohio 31 day(s) left Published 10/29/2025 Closing 12/18/2025 443727333806
GUARDRAIL REBUILDING C/R/S: D07 GR FY 2026 Ohio 31 day(s) left Published 10/29/2025 Closing 12/18/2025 443727333807
PAVEMENT MARKING C/R/S: D08-R-W/R-FY26 Ohio 31 day(s) left Published 10/29/2025 Closing 12/18/2025 443727333808
SPOT PATCHING / PAVEMENT REPAIR C/R/S: FRA-IR 670 SP FY26 Concrete Ohio 31 day(s) left Published 10/29/2025 Closing 12/18/2025 443727333810
BRIDGE REPAIR C/R/S: FRA/MRW-71/288-17.013 R/0.073 Ohio 31 day(s) left Published 10/29/2025 Closing 12/18/2025 443727333811
BRIDGE REPAIR C/R/S: FRA-0003-16.59 Damage Repair Ohio 31 day(s) left Published 10/31/2025 Closing 12/18/2025 443730403037
BRIDGE REPAIR C/R/S: SCI/JAC-52/93-35.72/15.48 Ohio 31 day(s) left Published 10/31/2025 Closing 12/18/2025 443730403038
BRIDGE REPAIR C/R/S: CUY-IR 77-15.46/VAR Decks Ohio 31 day(s) left Published 10/31/2025 Closing 12/18/2025 443730403039
BRIDGE REPLACEMENT (1 BRIDGE) C/R/S: FAI-US 22-03.68 Ohio 31 day(s) left Published 10/31/2025 Closing 12/18/2025 443730403040
SIDEWALK C/R/S: KNO-SR 3-25.94 Ohio 31 day(s) left Published 10/31/2025 Closing 12/18/2025 443730403041
SLIDE REPAIR C/R/S: MOE-SR 78-08.35 Ohio 31 day(s) left Published 10/31/2025 Closing 12/18/2025 443730403042

Your search returned no results.

suggestions:

  • Make sure that all words are spelled correctly.
  • Try different words that mean the same thing.
  • Try more generic terms.

of 400