The work consists in general of approximately 3.2 miles of Class IV bikeways and Class II bike lanes in the City of San Diego along San Diego Avenue between Noell Street and Washington Street, Washington Street from Hancock Street to University Avenue, and a small portion of Camino de la Reina. Third Avenue and Hotel Circle S traffic calming features include sidewalk, traffic signal, and streetlight installation and other road construction. Work includes mobe/demobe, roadway construction (demolition, excavation, grading, curb and gutters, paving, pedestrian ramps, driveways, signage and striping), landscaping/hardscaping, drainage, including stormwater best management practices, structural construction of retaining walls, streetlights, traffic signal modifications, traffic control, water pollution control, survey, utility relocations or adjustments.
Work includes, but is not limited to, controlling for water pollution; traffic control; erosion control; clearing and grubbing; curb, gutter, cross gutter, driveway, colored concrete, and sidewalk work; roadway excavation; imported borrow; asphalt concrete pavement; PCC pavement; landscaping and irrigation; proprietary BMPs; wayfinding signage; pavement markings and signage; street lighting; trenching and backfill for underground electric conduits; water appurtenances and fire hydrant relocations; storm drain installation; traffic signal modifications. There are four additive alternatives (for architectural treatment, for mill and overlay at two locations, and for a bus pad on Hotel Circle South). The work also includes the procurement of all materials and performing all other work necessary to complete the work in accordance with the project plans and specifications.