Specifications include, but are not limited to: 1.1 Project Design (subtotal of m.s.v. 1.1.1 to 1.1.4) S.V. $ 1.1.1 Roadway/Highway Design Services m.s.v. $ 1.1.2 Traffic Engineering Design Services m.s.v. $ 1.1.3 Bridge Design Services m.s.v. 1.1.4 All Other Design Services m.s.v. $ 1.2 Mobilization and Project Closeout S.V. $ 1.3 Existing Demolition S.V. $ 1.4 Roadway Bridge Construction S.V. $ 1.4.1 Bridge No. 126601 Gano Street On-Ramp 1.4.2 Bridge No. 126701 Waterfron Drive Off-Ramp Bridge 1.4.3 Bridge No. 070001 Washington Bridge 1.5 Roadway Construction (including intersections, local roads, highway, ramps and drainage) S.V. $ 1.6 Signing and Paving Markings S.V. $ 1.7 Maintenance and Protection of Traffic S.V. $ 1.8 ITS System S.V. $ 1.9 Owner Specified General Condition Items (subtotal of m.s.v. 1.9.1 to 1.9.6) S.V. $ 1.9.1 Quality Management Plan m.s.v. $ 1.9.2 Quality Control Plans m.s.v. $ 1.9.3 Project Schedule m.s.v. $ 1.9.4 Construction Field Office m.s.v. $ 1.9.5 Training Hours (2000)* m.s.v. $ 12,000.00 1.9.6 Document Control Specialist m.s.v. $ 1.1 Environmental Management S.V. $ $ 1.11 Other Costs to be included in the LS not broken down above S.V. $ $ 1.12 Estimated Cost Items (Subtotal of 1.13.1 to 1.13.5) S.V. $3,600,000.00 1.12.1 Management & Disposal of Regulated Materials** m.s.v. $500,000.00 1.12.2 Bridge and Road Special Maintenance** m.s.v. $750,000.00 1.12.3 Bridge and Road Special Maintenance** m.s.v. $750,000.00 1.12.4 State-Directed Additional Maintenance and Protection of Traffic (MPT) ** $300,000.00 1.12.5 Towing $500,000.00 1.12.6 Pay Adjustments ** m.s.v. $500,000.00 1.12.7 Price Adjustments ** m.s.v. $300,000.00