Specifications include, but are not limited to: In the area shown on the contract drawings the selected contractor is responsible for securing the work zone with a 6’ temporary fence; excavating and maintaining, on site, the sand that was placed to cover the boardwalk; completely removing and disposing of all wood decking, integrated wood benches, railings, and hardware to expose top of existing concrete footings; Thoroughly cleaning exposed footings; and installing connection plates, decking, trim boards, integrated benches, and railings as shown on the contract drawings. After construction is complete the contractor shall rake all sand back into place to the bottom of the decking. The City has measured the section of boardwalk located in the base bid, not including the bench areas, to be approximately 395 LF +/-. This measurement is provided for convenience to the Contractor and must be confirmed by the contractor prior to bid submission. It is the Contractor’s responsibility to bid the project based on their own plan takeoffs and field measurements.