Specifications include, but are not limited to: This Contract consists of work performed on the Route 138 Corridor from the East Abutment of the Newport Bridge to Route 1A including work performed on the Newport and Jamestown Bridges. The Contract will be for a two-year period followed by an optional extension of one year. The optional extension is at the discretion of the Authority. The work performed includes spall repairs (both above and underwater), concrete crack repairs, bridge joint header and seal repairs, concrete and bituminous curbing removal and replacement, concrete repairs to bridge roadway deck and overlay, bridge railing repairs/removal/replacement, and other miscellaneous repair/work items as outlined in the Contract Drawings and the Contract Specifications.