Specifications include, but are not limited to: The project shall consist of the purchase, delivery, and installation of outdoor bleachers at the Ward High School track/football field Visitor side only. The new bleachers will be in the same location as the current bleachers. Demolition of the existing metal bleacher system including concrete foundation must be included. Construction of a new 423 occupant (includes 6 ADA seats) metal bleacher system including concrete foundation as specified by the bleacher manufacturer. Miscellaneous site work such as re-grading will be included. • 9 row bleachers, with row-to-row dimension of 10” rise per row and 26” row depth • Colors, materials, finishes to match exiting Home Bleacher Section • Minimum 6-foot-wide front crosswalk elevated minimum of 42” above grade • Maximum seating capacity allowable by code • Demolition and removal of bleachers and support structures (if applicable) • Include ADA ramp and seating for new or upgraded bleachers; one wheelchair ramp, two stairs, one landing • Minimum number of required wheelchair spaces • All required vertical aisles, 54” wide with handrails and half steps; • Perimeter anodized guardrails with chain link fence;