Specifications include, but are not limited to: Provide design, bidding support and construction administration services to facilitate the master plan visions for the repair and/or reconstruction of roads and parking lots at the Kingston and Alton Jones campuses to include: Section A: Pre-schematic Design 1. Master Plan Review: Review University’s various master plans and studies and consult with Office of Capital Projects, Campus Planning & Design, Public Safety, Facilities and Utilities, and other URI offices to review various campus initiatives including planned building/academic/athletic/support service building projects, RIPTA routes and Rhody Transit routes, autonomous vehicle integration opportunities, and the campus-wide signage program. Consider need for Public Safety enhancements along roadway or lot (lighting, security cameras, blue lights, automated parking lot gates (or gateless systems) as well as electric vehicle (EV) charging stations. 2. Development of Options: Along with direction from Office of Capital Projects and Campus Planning & Design, development one of three (3) alternative design concepts for each road and parking lot that generally fit into the following categories: A. Pavement Maintenance Option: This option will include basic pavement management treatments including cold planning and overlay, crack sealing, restriping, maintenance of existing curb/pavement edges, and little to no utility work. RIDEM permitting will not be required for this limited scope of work. (see Appendix E for list of roads and lots)