Specifications include, but are not limited to: a.Furnish and install temporary emergency supply power.b.Remove and dispose of existing 250 KW Onan generator set mounted exterior ofthe facility.c.Remove and dispose of existinggeneratorconcrete foundationd.Excavate and furnish &install handhole at the location of the existing feeders forthe generator.e.Form and place concrete foranew concrete pad tocomply with setbacks from the existing gas meter on the booster pump station building.i.Any necessary changes to the stone service driveway shall be included. f.Furnish and installanew350 KW generatori.New generator shall be positioned so it can be serviced in the same fashion as the existing generator (i.e., drive-up service)ii.Initial fuel fill shall be included.iii.Testing, start-up, and standard 1 year warranty shall be included.g.Extend feeders from new handhole to new generator.h.Furnish and install new remote annunciator within the booster pump station buildingi.Install 3 protective bollards on the side of the generator facing the stone drivewayj.All required excavation, backfill and concrete is included.