The Contractor shall furnish all labor, materials, equipment, and supervision necessary to complete the work described below: • Disconnect, demolish, remove, and dispose of the existing sodium hypochlorite storage tank. • Dispose of the tank in accordance with all applicable RIDEM, EPA, and OSHA regulations. • Furnish and install one (1) new 905-gallon sodium hypochlorite bulk storage tank. • Tank shall: o Match the existing tank in size, configuration, orientation, material, and connection locations, where practicable. o Be suitable for sodium hypochlorite service. o Comply with applicable industry standards and manufacturer recommendations. • Install the new tank on the existing concrete tank pad, which shall be reused. • Reconnect all existing influent, effluent, vent, overflow, fill, and drain piping as required. • Furnish and install one (1) new expansion joint compatible with sodium hypochlorite service. • Replace gaskets, fasteners, and minor piping components as necessary to ensure a complete and leak-free installation. • All materials shall be chemically compatible with sodium hypochlorite. • Perform leak testing and system testing of the tank and associated piping. • Prepare the system for service. • Coordinate startup and place the system into full operational service with Wastewater Treatment Facility personnel.