a. Survey b. Geotechnical investigation, analysis and design c. Subsurface Utility Engineering, coordination, relocation and/or temporary support and protection inplace d. Bridge and wall (including temporary and/or retaining) analysis and design e. Highway engineering and design f. Temporary traffic control design and management as required to support staged construction g. Traffic engineering, data collection, and/or analysis h. Design and Construction Quality Assurance/Quality Control i. Environmental (permitting; soils and hazardous materials management, including testing, handling and disposal; SWPPP, landscaping, etc.) j. Cultural Resource identification and mitigation during construction k. Final Design and Construction of all elements presented in this RFQ l. Construction activities for new bridge structures listed above m. Construction activities for intersection realignment at the location listed above n. Roadway reconstruction including full depth and mill and overlay o. Sidewalk and ramp rehabilitation, construction, and extension within the project limits to comply with PROWAG. p. Replacement and installation of traffic signage and roadway striping q. Stormwater management systems design and construction, including collection, conveyance, treatment, and discharge facilities