Specifications include, but are not limited to: The Contractor shall furnish all labor, equipment, materials, tools, supplies, mobilization, overhead, transportation and all other incidental items for the removal, disposal and installation of asphalt in the City of Woonsocket. The work, in general, shall include the following: All edges are to be saw cut to the full depth of the existing asphalt. Excavate, remove and properly dispose of existing asphalt and install new permanent asphalt to a depth directed by the City of Woonsocket Engineering Division or Water Division. Excavate additional unsuitable material below sub-grade, install suitable gravel and compact, only as directed. All edges are to be primed with 0.5 gal. / sq. yd. emulsion. Provide and install asphalt. Crack seal edges ASSIGNMENT OF WORK The locations of the asphalt work in each City district shall be given to the Contractor as soon as a list is complied. Additional work will be made only in those City districts not yet completed by the Contractor. All other work will be placed on the next list. It is the City’s intent to provide the Contractor with steady work with each list. CONTRACTORS RESPONSIBILITIES -Be responsible to obtain a ‘DIG SAFE’ number prior to commencing work. -Obtain any necessary Federal, State and Local permits. -Contractor shall provide a ‘Competent Person’, as defined by the US Department of Labor Occupational Safety & Health Administration (OSHA), for the location of the proposed work. The contractor shall employ only competent and efficient laborers, operators and tradesmen for every kind of work, and whenever, in the opinion of the City Engineer, any person is unfit to perform their task, or does their work contrary to directions, or conducts themselves improperly, the contractor must discharge that person immediately and not employ that person again on the work.