Specifications include, but are not limited to: A) Supply & Install one Siemens 3-Phase 100 amp 40 circuit bolt on breaker panel -Run copper feeder wire or pipe from main panel in boiler room threw administration hallway in EMT pipe or MCA wire. Approximately 200 feet -Install Siemens 100 amp 3- Phase bolt on breaker in the main panel B) 16 Stylist stations: Supply and install 2- 20amp circuits from panel to each stylist station -MC or copper wire in EMT through ceiling -Pipe drops to each station -Remove existing wiring, refeed existing outlets C) Nail Room / Teaching area across hall: Supply and install 4 circuits -MC or copper wire in EMT through ceiling from panel to designated locations -Pipe drops to each station -Install Quad receptacle.