Specifications include, but are not limited to: a)Follow all current governing standards and procedures for TAB related work; b)Perform the specified commissioning support requirements coordinating with the CxA; c)Review contract documents to become familiar with project requirements and conditions; d)Review design data, assumptions, equipment performance, and system descriptions; e)Provide design and submittal reviews, TAB related documents to incorporate into the construction documents, installation verification, and operations and maintenance (O&M) training as appropriate; f)Develop TAB plan with complete system readiness checks and reports; g)Develop procedures for an issues log to track all TAB related issues, deficiencies, and resolutions; h)Verify system and equipment item installations are complete and all specified testing, cleaning, adjusting, and commissioning have been performed; i)Provide final TAB; and j)Review system and equipment item test reports and perform required inspections and measurement verifications.