Specifications include, but are not limited to: 1)Purchase of the 104 batteries neededfor this installation2)Removal and proper disposal of the old batteries3)Perform a thorough dusting and vacuuming of all cabinet interiors.4)Check and calibrate each system, to include switchgear and circuit breakers, meters, and alarm levels for frequency, voltage, current, transfer, trip, alarm. Etc.5)Perform system and component functional tests on all UPS equipment to insure proper functioning within system parameters.6)Off-line load test the UPS system to ensure the system is completely functional.7)Return the UPS to service following the manufacturers recommended start-up procedures. Make sure that no damage to the UPS equipment or shutdown will occur because of inrush currents.8)Check battery levels.9)Provide Facilities Engineer with a complete field activity report of these checks within a week.