Specifications include, but are not limited to: The Contractor must provide all labor, materials, equipment, permits and supplies required for the installation of electrical service that will provide power to the conex box. Contractor shall follow all building codes and regulations. A. Contractor will remove existing breakers and install two (2) – 20-amp double pole breakers and install one (1) – 30-amp breaker in the emergency electrical panel to supply power to the evidence conex box. B. Contractor will supply and install approximately 230 feet (contractor is responsible to verify measurement) of 2-inch conduit from the source of electricity to the evidence conex box. C. Contractor will run #6-gauge wire from the emergency panel to the evidence conex box and connect to the emergency panel 30-amp breaker and to the breaker box on the evidence conex box. D. Contractor will test the new circuit to ensure it works properly. E. Contractor will keep area clean and free of debris and removal of all debris daily. F. Contractor will warranty workmanship for one (1) year.