Specifications include, but are not limited to: Install EV Chargers Meeting the Following Requirements: 1. Installation: The Awardee is responsible for achieving a completed, fully operational installation at the EV Charging Site, to include: a. Obtaining all applicable local, state and federal permits required for installation and operation of the EV charger; b. Ensuring that all installation work as it pertains to site preparation, curbing, striping, signage, charging equipment, billing and networking systems (if applicable), and electrical interconnections is installed: i. consistent with the manufacturers’ specifications, ii. consistent with any project design proposed in the bid, iii. in accordance with all applicable local, state and federal zoning and code requirements, and iv. is working properly.