Specifications include, but are not limited to: A.Bidders are hereby made aware that the City of Seaford will photo document the condition of all subject properties prior to demolition operations. Items such as (but not limited to) sidewalks, curbs, driveways, roads, fencing, adjacent properties or otherfeatures that are damaged once the contractor commences operations on the property (or any adjacent location) must be restored to a “before construction or better” condition by the contractor at no additional compensation beyond the prices bid. The contractor is notified to use extreme caution and care during all operations. B.The City of Seaford has had locations #1, 2, 3& 4surveyed by qualified individuals for the presence of asbestos. Asbestos containing materials were found at location #1 & 4which is detailed in the attached reports by Sussex Environmental Consultants. The asbestos abatement will be the contractor’s responsibility prior to any demolition operations. All prices for asbestos removal shall be included within the bid prices provided bythe contractor. No additional compensation will be provided by the City beyond the bid prices submitted by the contractor at bid time. C.All removal of asbestos (or other hazardous materials) shall be accomplished in accordance with all applicable Delaware Division of Natural Resources and Environmental Control (DNREC) and Environmental Protection Agency (EPA) requirements. The contractor (or subcontractor for the prime contractor) shall poses a valid licenseissued by DNREC for the removal of hazardous materials identified in the attached report. Proof of such licensure shall be provided to the City Manager prior to the start of removal. The City shall be provided all disposal manifests and other required documentation that ensures the proper removal, handling and disposal of all hazardous materials removed from each location prior to final payment to the contractor.D.The Contractor shall demolish and completely remove the structures identified at the locations above. All debris removed from the site(s) by the contractor shall be legally transported and disposed of at a DNREC approved facility, recycling facility or the DSWA landfill. Demolition debris may not be disposed of on-site.E.The Contractor is responsible for removal of any mechanical equipment &/or fuel tanks. This shall include the proper evacuation of any Freon, refrigerant or fuel that may be contained within any of the mechanical equipment.